Analyse-Workflow
This guide walks through Discovery for a business operator or integrator.
1. Open Mission Control
From Dolibarr admin → Knot › Migration. Empty state: « Run a diagnostic » button. Populated state: history with badges (in progress, completed, failed).
2. Pick the upgrade path
- Source version: auto-detected (CLI override possible)
- Target version: from Dolibarr 18.x–23.x references
If the source is out of range, banner KM_PATH_UNSUPPORTED_SOURCE — integrator escalation required.
3. Snapshot generation
Progress bar ~5–30 s: schema, modules, extrafields, integrations. Summary card: « N tables, M modules, K extrafields ».
4. Analysis report
At least five sections with severity badges. In-app HTML export; Markdown/JSON for automation.
5. Recommended actions
- Open tickets for critical items
- Schedule cloning dry-run
- Move to Planning to formalize the migration plan